DEMO — sample data, resets on reload

Demo · Custom internal tools

What a custom internal tool feels like


This page is a demo: a small job tracker loaded with six fictional jobs. Edit anything, add jobs, delete jobs — nothing is saved, and it all resets on reload. A real build would save your data, be shaped around how your business actually runs, and live at your own link.

Sample data · six fictional jobs

The job tracker

Every number below is editable and everything recomputes as you type. Job cost = labor hours × (burdened labor rate + overhead per labor hour) + materials — the two rates are starting numbers you can change under cost settings.

Your numbers never leave this page — everything is computed right here in your browser.

Cost settings — starting numbers

Wages plus payroll costs, per labor hour. A starting number — overwrite it with your own.

Trucks, fuel, insurance, phones — spread over each labor hour. Also a starting number.

How each job is costed: labor hours × (burdened rate + overhead rate) + materials. Margin is revenue minus that cost.

Total revenue

$6,040

Total margin

$1,849

Overall margin

30.6%

Worst job

Mow — −$38 (loss)

Job list — fictional sample data. Job type, revenue, labor hours, and materials are editable; job cost, margin, and margin percent are computed.
Job type Revenue ($) Labor hours Materials ($) Job cost ($) Margin ($) Margin % Remove row
Mow $150 6 $20 $188 −$38 −25.3%
Spring cleanup $480 12 $45 $381 $99 20.6%
Mulch install $850 10 $320 $600 $250 29.4%
Patio repair $2,400 38 $610 $1,674 $726 30.3%
Hedge trim $260 7 $0 $196 $64 24.6%
Drainage fix $1,900 24 $480 $1,152 $748 39.4%
Totals $6,040 97 $1,475 $4,191 $1,849 30.6%

One of the six sample jobs is priced below cost at the starting numbers: the $150 mow takes six labor hours that cost more than the job brings in — a −$38 loss every time it runs. That's exactly the kind of thing a tracker like this surfaces the first week you use it.

Add a job

Where the margin is

Margin by job type

Jobs with the same type name roll up together. Add a second "Mow" above and watch this regroup.

Mow
−$38 · loss
Spring cleanup
$99
Mulch install
$250
Patio repair
$726
Hedge trim
$64
Drainage fix
$748

Bars start at $0 — the thin vertical line. A loss reads to the left of it and is labeled with a minus sign and the word "loss"; every bar carries its own value.

Beyond the demo

What a real one looks like

It saves

This demo forgets everything on reload — on purpose. A real build keeps every job you enter: running totals, history you can look back on, numbers that are still there tomorrow.

It fits your business

Your job types, your cost structure, the fields your crew actually fills in. Before anything gets built, we work through how your jobs really run — the tool is shaped around that, not a generic template.

It lives at your link

A working, hosted web app at your own address — bookmark it on any phone, share it with staff. No monthly platform fee, and you own it outright.

A tool like this, built around your jobs and saved properly, is a $1,500–$5,000 engagement — scoped and quoted before any work begins.

Everything on this page is a demonstration with fictional sample data — the six jobs describe no real business, and any numbers you type stay in your browser and vanish on reload. I do job costing and pricing analysis. I am not an accountant, and this is not an audit, a review, or an opinion on your financial statements. If you need those, I'll point you to a CPA.